September 7, 2010 ~ 03:31:46 AM * -07:00ST


everybody pointing in the same direction?

Post # 546 by admin on June 15th, 2009 ~ 08:13:43 AM
Posted as app services, requirements | No Comments »

MELcheck the Business Requirement to verify that the Functional Requirements and the UAT have been satisfied.

verify that client business unit and IT approvals have been obtained.

verify that the Quality Gate Checklist is complete.


additionally insured

Post # 540 by admin on June 5th, 2009 ~ 10:41:05 AM
Posted as contract mgmt | No Comments »

MELif flow-downs exist, the Business Office Manager already has contractual insurance obilgations under control. any issues regarding certificates should be registered in the issue log.


change happens

Post # 537 by admin on June 4th, 2009 ~ 10:29:02 AM
Posted as contract mgmt | No Comments »

MELthe guys that wrote the original contract are off doing their sales thing on some other deal and they aren’t around to address contract defects that surface after the deal has been operating for some time.

a contract change process better be baked into the contract. everybody needs to understand how the process works and how the approvals take place.

and don’t even think about enhacing the delivery capability until the associated change has been formally agreed.


connecting the dots

Post # 533 by admin on June 3rd, 2009 ~ 10:13:51 AM
Posted as contract mgmt | No Comments »

MELflow-downs ensure the execution of specific deliverables by sub-contractors. the master contract defines specific responsibilities for the service provider, and inevitably, the service provider engages sub-contractors to fulfill portions of those responsibilities. flow-downs map the delegation and give the BOM a tool to ensure contract compliance.


localisms

Post # 530 by admin on June 2nd, 2009 ~ 10:07:47 AM
Posted as contract mgmt | No Comments »

MELthe business office manager should be the center of knowledge for all contracts, including those that are required to support specific sites, the “local agreements”. they too have requirements that the BOM should acknowledge in invoicing, service level reporting, and the issue mgmt process..


boring, but necessary

Post # 527 by admin on June 1st, 2009 ~ 09:41:34 AM
Posted as contract mgmt | No Comments »

LNYsomebody has to take custody of the contract and wrap some access control procedures around it. client copies aren’t easily controlled, but the service provider should extract relevant pieces and save the original in a safe place. the contract is not a tool from business office or delivery people to wave around every time there is a roles and responsibilities discussion with client representatives. this behavior tends to make people resentful and distrustful.

certain components need to be derived from the contract and used as important references, the “deliverables list” comes to mind. the business office manager should feel confident that the tower leads understand their obligations and are following through.

the contract itself may describe how the contract should be handled. if not, an access control process with some means of authorizing and tracking access would help. amendments deserve the same treatment.


service level template

Post # 481 by rc on May 29th, 2009 ~ 08:35:19 AM
Posted as metrics | No Comments »

DEN- its always a good idea to start with the SERVICE LEVEL NAME.
- then attach the DEFINITION and identify the TYPE (KPI or SLO).
- define the method of measurement and the calculation to determine the VALUES.
- define the TARGET and the MINIMUM
- define any LIMITATIONS (this is where the statistics guru needs to sign-off)
- SERVICE WINDOWS (periods or conditions for which the SLO is enforced; think about CAPACITY and QUIET PERIODS)


service level template

Post # 478 by admin on May 27th, 2009 ~ 08:18:23 AM
Posted as metrics | No Comments »

FRA“the effectiveness of the agreed services defined in attachment x.x is determined by describing the scale of two measurable values.” (Sounding good so far.) “the two values for the Service Level Objective adopted herewith are:” (The Legal guys were probably feeling very uncomfortable at this point.)

#1: the Target SLO represents the lowest value above which the service provider is considered to have fully met the service delivery requirements associated with that metric.

#2: the Minimum SLO is the highest value below which the service provider is considered to have fully missed the service delivery requirements. The outsourcer considers this performance level unacceptable and requires a remediation plan.


service request closure

Post # 474 by rc on May 26th, 2009 ~ 01:25:24 PM
Posted as IMACD | No Comments »

FRA- update the asset mgmt and configuration mgmt systems
- ensure billing record is correct (including expedited service parameters)
- verify required collected IMACD information
- return necessary material (properly identified) to the depot for further disposition
- close the request


placing a service request

Post # 462 by admin on May 25th, 2009 ~ 11:34:52 AM
Posted as IMACD | No Comments »

FRAhelpdesk responsibilities to gather and document incident content goes a long way to getting the right resource dispatched and the ticket closed in the SLA window. a helpdesk knowledgeable about the workgroups, business processes, and available services drops a high quality ticket in the service request queue.

incomplete data normally causes the resolver group to bounce the ticket back to the helpdesk for more information. the SLA clock should be reset and the helpdesk should communicate the new deadlines to the end user.